PIPE & OPEN-WEB JOISTS
GIVEN
d pipe diameter
in
L joist spacing (center to center) ft
D total depth of the joist in
W width of the chord of the joist in
h height of the chord of the joist in
l total cut length of the pipe ft
PIPE RISE CONCEPT
g length of opening (gap) between joists ft
g = L - (W / 12)
r slope of the pipe as it slips past joist in / ft
r = (d + h) / g
∆d total rise of the pipe above bottom of joist, when slipping past joist in
Δd = l x r
∆o available height for pipe to slip inside of top chord in
Δo = D - h
lm maximum length of pipe given joist parameters ft
lm ≤ (D - h) (L - W/12) / (d + h)
SIMPLIFIED FORMULA
lm maximum length of pipe given joist parameters ft
lm ≤ (D2/3 + g2/3)3/2
ED MILLER AFSA FORMULA
lm maximum length of pipe given joist parameters ft
lm ≤ (D / 6) x L