Skills assessment - CPC50210 Diploma of Building and Construction (Building) Introduction Use this skills assessment form to give you an idea as to whether you would be successful in an RPL application for a unit/s. Scroll down the form, click on the relevant unit code to open the form up for that unit and select from the drop down list the relevant number of times you have performed that task yourself. Once you have provided a response for each unit, and/or previous study option, go to the 'summary' section. This will summarise the likelihood of whether you would be successful in an RPL application. The units that you can provide a response to are listed below. They are also indicated whether they are a core or elective unit. In order to achieve the full qualification, you need to complete thirteen (13) core units and five (5) elective units. However you can RPL any number of units, you can complete the remainder required by normal enrolment. More information on the qualification can be found at: https://training.gov.au/TrainingComponentFiles/CPC08/CPC50210_R2.pdf If we can help with anything at all while you are completing this form, or if you have any questions about anything else, please don't hesitate to contact us on 1300 797 123 or email [email protected] Unit Core/elective Core Core Core Core Core Core Core Core Core Elective Elective Elective Elective Elective Elective Elective Elective Elective Elective Elective
BSBOHS504B Apply principles of OHS risk management Have you performed the following: "" Task Response Accessed and reviewed external sources of information and data to assit in identifying hazards Please select Never done Less than 10 Around 10-50 More than 50 Sought input from stakeholders and conducted formal and informal research Please select Never done Less than 10 Around 10-50 More than 50 "" Analysed the work environment to identify hazards Please select Never done Less than 10 Around 10-50 More than 50 "" Examined workforce structure and environment for potential injury or illness Please select Never done Less than 10 Around 10-50 More than 50 "" Examined task demands and task environment for potential injury or illness Please select Never done Less than 10 Around 10-50 More than 50 "" Assessed risks associated with hazards and identifying controls and adequacy of controls Please select Never done Less than 10 Around 10-50 More than 50 Documented method and outcome of risk assessment and prioritise hazards Please select Never done Less than 10 Around 10-50 More than 50 Developed a range of control options and identified potential factors affecting controls Please select Never done Less than 10 Around 10-50 More than 50 Analysed extent of change and reduction in risk as a result of controls Please select Never done Less than 10 Around 10-50 More than 50 Established and maintained a risk register relevent to the workplace Please select Never done Less than 10 Around 10-50 More than 50 Document and communicate risk management procedures and outcomes to stakeholders Please select Never done Less than 10 Around 10-50 More than 50 Identify situations where OHS specialists may be required and involve stakehoders in processes Please select Never done Less than 10 Around 10-50 More than 50 Determined frequency, method and scope of review in consultation with stakeholders Please select Never done Less than 10 Around 10-50 More than 50 Identified areas for improvement in the risk management process and make recommendations Please select Never done Less than 10 Around 10-50 More than 50 Prepared action plans, including allocated responsibilities and timeframes for implementation Please select Never done Less than 10 Around 10-50 More than 50 Regularly reviewed effectiveness of risk management processes Please select Never done Less than 10 Around 10-50 More than 50 "" ""
BSBPMG505A Manage project quality Have you performed the following: "" Task Response Determined quality objectives with input from stakeholders for the basis for a quality plan Please select Never done Less than 10 Around 10-50 More than 50 Determined quality standards with input from stakeholders for the basis for a quality plan Please select Never done Less than 10 Around 10-50 More than 50 "" Determined quality levels with input from stakeholders for the basis for a quality plan Please select Never done Less than 10 Around 10-50 More than 50 "" Selected and used established quality management methods Please select Never done Less than 10 Around 10-50 More than 50 Selected and used established quality management techniques Please select Never done Less than 10 Around 10-50 More than 50 Selected and used established quality management tools Please select Never done Less than 10 Around 10-50 More than 50 Identified quality criteria and communicated to stakeholders Please select Never done Less than 10 Around 10-50 More than 50 Included agreed quality requirements in the project plan Please select Never done Less than 10 Around 10-50 More than 50 Measured and documented results of project activities and product performance Please select Never done Less than 10 Around 10-50 More than 50 Identified causes of unsatisfactory results and recommended appropriate actions Please select Never done Less than 10 Around 10-50 More than 50 Conducted inspections of quality processes and quality control results Please select Never done Less than 10 Around 10-50 More than 50 Maintain a quality management system Please select Never done Less than 10 Around 10-50 More than 50 Reviewed quality processes Please select Never done Less than 10 Around 10-50 More than 50 Implemented agreed changes continually throughout the project life cycle Please select Never done Less than 10 Around 10-50 More than 50 Reviewed project outcomes against performance criteria Please select Never done Less than 10 Around 10-50 More than 50 Identified and documented lessons learned and recommended improvements Please select Never done Less than 10 Around 10-50 More than 50 "" ""
BSBPMG508A Manage project risk Have you performed the following: "" Task Response Identified risks in consultation with stakeholders as the basis for risk planning Please select Never done Less than 10 Around 10-50 More than 50 Documented risks in consultation with stakeholders as the basis for risk planning Please select Never done Less than 10 Around 10-50 More than 50 "" Analysed risks in consultation with stakeholders as the basis for risk planning Please select Never done Less than 10 Around 10-50 More than 50 "" Used established risk management techniques and tools to analyse risks Please select Never done Less than 10 Around 10-50 More than 50 Used established risk management techniques and tools to assess options Please select Never done Less than 10 Around 10-50 More than 50 Used established risk management techniques and tools to recommend risk approaches Please select Never done Less than 10 Around 10-50 More than 50 Developed risk management plans Please select Never done Less than 10 Around 10-50 More than 50 Secured agreement of stakeholders and communicated plans to ensure clarity of understanding Please select Never done Less than 10 Around 10-50 More than 50 Established risk management processes to enable effective management of risk events Please select Never done Less than 10 Around 10-50 More than 50 Established risk management processes to enable effective management of risk responses Please select Never done Less than 10 Around 10-50 More than 50 Established risk management processes to enable effective management of risk results Please select Never done Less than 10 Around 10-50 More than 50 Managed project in accordance with risk management plans Please select Never done Less than 10 Around 10-50 More than 50 Monitored progress against project plans to identify variances Please select Never done Less than 10 Around 10-50 More than 50 Implemented agreed risk responses and modified plans to reflect changing project objectives Please select Never done Less than 10 Around 10-50 More than 50 Reviewed project outcomes to determine effectiveness of risk management processes Please select Never done Less than 10 Around 10-50 More than 50 Identified and documented risk issues and recommended improvements Please select Never done Less than 10 Around 10-50 More than 50 "" ""
CPCCBC4001B Apply building codes and standards to the construction process for low rise building projects Have you performed the following: "" Task Response Liased with engineers and certifiers Please select Never done Less than 10 Around 10-50 More than 50 "" Used Volume 1 and 2 of the BCA Please select Never done Less than 10 Around 10-50 More than 50 "" Obtained Forms 15, 16 and 21 for a project (Certificates) Please select Never done Less than 10 Around 10-50 More than 50 "" Applied clauses from the BCA to a project Please select Never done Less than 10 Around 10-50 More than 50 "" Determined requirements from the BCA for a project Please select Never done Less than 10 Around 10-50 More than 50 "" Determined and used requirements from referenced Australian Standards for a project Please select Never done Less than 10 Around 10-50 More than 50 "" Determined the nature of a building according to its use Please select Never done Less than 10 Around 10-50 More than 50 "" Determined the Class of a building using the criteria in the BCA Please select Never done Less than 10 Around 10-50 More than 50 "" Ensured a project meets BCA's requirements Please select Never done Less than 10 Around 10-50 More than 50 "" Researched and used a 'Performance Solution' to meet Performance Requirements in BCA Please select Never done Less than 10 Around 10-50 More than 50 "" Researched and used a 'Deemed-to-Satisy' / 'Acceptable Construction Practice' solution Please select Never done Less than 10 Around 10-50 More than 50 "" Determined the FRL's for a variety of low rise buildings Please select Never done Less than 10 Around 10-50 More than 50 "" Identified and applied passive and active fire protection to low rise buildings Please select Never done Less than 10 Around 10-50 More than 50 "" Conducted an audit of an existing building for passive and active fire protection requirements Please select Never done Less than 10 Around 10-50 More than 50 Established and implemented processes to coordinate the work of professional consultants Please select Never done Less than 10 Around 10-50 More than 50 Built or supervised a low rise building or dwelling Please select Never done Less than 10 Around 10-50 More than 50 "" ""
CPCCBC4003A Select and prepare a construction contract Have you performed the following: "" Task Response Identified various types of building and construction contracts Please select Never done Less than 10 Around 10-50 More than 50 Identified and analysed essential terms and elements of a valid contract Please select Never done Less than 10 Around 10-50 More than 50 "" Analysed the importance of identifying an intention to create legal relations Please select Never done Less than 10 Around 10-50 More than 50 "" Identified and analysed rights and liabilities under a contract Please select Never done Less than 10 Around 10-50 More than 50 "" Identified and applied common building contract terms and procedures Please select Never done Less than 10 Around 10-50 More than 50 "" Identified and analysed circumstances that bring about a breach of contract Please select Never done Less than 10 Around 10-50 More than 50 "" Identified and applied legislative requirements Please select Never done Less than 10 Around 10-50 More than 50 "" Selected and prepared a contract appropriate for the type of construction Please select Never done Less than 10 Around 10-50 More than 50 "" Identified and prepared a range of documents that make up a contract Please select Never done Less than 10 Around 10-50 More than 50 "" Confirmed the capacity of all parties to form a binding contract Please select Never done Less than 10 Around 10-50 More than 50 Identified and applied factors associated with the parties consent to a contract Please select Never done Less than 10 Around 10-50 More than 50 Defined, analysed and assessed factors leading to the termination of a contract Please select Never done Less than 10 Around 10-50 More than 50 Accurately calculated contract rise and fall amounts during the preparation of the contract Please select Never done Less than 10 Around 10-50 More than 50 Assessed and included a schedule of progress payments in the preparation of the contract Please select Never done Less than 10 Around 10-50 More than 50 Included processes for applying for extension of time in the preparation of the contract Please select Never done Less than 10 Around 10-50 More than 50 Sought expert advice in the preparation of a contract Please select Never done Less than 10 Around 10-50 More than 50 "" ""
CPCCBC4004A Identify and produce estimated costs for building and construction projects Have you performed the following: "" Task Response Correctly identified appropriate plans and drawings Please select Never done Less than 10 Around 10-50 More than 50 Read and understood project plans and specifications Please select Never done Less than 10 Around 10-50 More than 50 "" Interpreted levels, heights, gradients and other measurements Please select Never done Less than 10 Around 10-50 More than 50 "" Made measurements and quantities identified from plans and specifications Please select Never done Less than 10 Around 10-50 More than 50 Identified types and numbers of appropriate on-site personnel and time required Please select Never done Less than 10 Around 10-50 More than 50 Calculated labour hours for non-contact elements of on-site work Please select Never done Less than 10 Around 10-50 More than 50 Calculated costs or rates for required on-site work Please select Never done Less than 10 Around 10-50 More than 50 Identified physical resource requirements Please select Never done Less than 10 Around 10-50 More than 50 Produced lists of materials and calculated quantities Please select Never done Less than 10 Around 10-50 More than 50 Established quantities against project or standard construction contracts Please select Never done Less than 10 Around 10-50 More than 50 Obtained supplier prices for materials and consumables Please select Never done Less than 10 Around 10-50 More than 50 Identified and costed plant or equipment requirements Please select Never done Less than 10 Around 10-50 More than 50 Selected and applied appropriate labour rates and materials costs Please select Never done Less than 10 Around 10-50 More than 50 Determined and applied estimates of unit costs Please select Never done Less than 10 Around 10-50 More than 50 Applied overheads, workcover, EPA requirements, etc to costs Please select Never done Less than 10 Around 10-50 More than 50 Calculated completed estimated project costs for inclusion in a tender or bill Please select Never done Less than 10 Around 10-50 More than 50 "" ""
CPCCBC4010B Apply structural principles to residential low rise constructions Have you performed the following: "" Task Response Applied structural principles when planning the erection of a structure Please select Never done Less than 10 Around 10-50 More than 50 Applied structural principles when planning the demolition of a structure Please select Never done Less than 10 Around 10-50 More than 50 "" Analysed and planned for the structural integrity of a low rise building Please select Never done Less than 10 Around 10-50 More than 50 "" Analysed and planned for the structural integrity of a low rise building Please select Never done Less than 10 Around 10-50 More than 50 "" Planned and coordinated the laying of footings to a low rise building Please select Never done Less than 10 Around 10-50 More than 50 "" Managed the laying of footings to a low rise building Please select Never done Less than 10 Around 10-50 More than 50 "" Planned and coordinated the laying of a floor system to a low rise building Please select Never done Less than 10 Around 10-50 More than 50 "" Managed the laying of a floor system to a low rise building Please select Never done Less than 10 Around 10-50 More than 50 "" Planned and coordinated the building of the wall system to a low rise building Please select Never done Less than 10 Around 10-50 More than 50 "" Managed the building of the wall system to a low rise building Please select Never done Less than 10 Around 10-50 More than 50 "" Planned and coordinated the building of the roof system to a low rise building Please select Never done Less than 10 Around 10-50 More than 50 Managed the building of the roof system to a low rise building Please select Never done Less than 10 Around 10-50 More than 50 Planned and coordinated the fixing of the wall cladding system to a low rise building Please select Never done Less than 10 Around 10-50 More than 50 Managed the fixing of the wall cladding system to a low rise building Please select Never done Less than 10 Around 10-50 More than 50 Supervised the installation of windows and external doors Please select Never done Less than 10 Around 10-50 More than 50 Have you built or supervised the construction of a residential low rise building? Please select Yes No "" ""
CPCCBC4013A Prepare and evaluate tender documentation Have you performed the following: "" Task Response Selected contracts according to company policy Please select Never done Less than 10 Around 10-50 More than 50 Evaluated tender documents for the selected contract Please select Never done Less than 10 Around 10-50 More than 50 "" Considered risks when preparing the tender Please select Never done Less than 10 Around 10-50 More than 50 "" Identified and obtained all information necessary for preparing the tender Please select Never done Less than 10 Around 10-50 More than 50 Followed company procedures and instructions in preparing the tender Please select Never done Less than 10 Around 10-50 More than 50 Identified and selected information and documentation required to support the tender Please select Never done Less than 10 Around 10-50 More than 50 Attached vital information to the tender documentation as required Please select Never done Less than 10 Around 10-50 More than 50 Attached drawings to the tender documentation as required Please select Never done Less than 10 Around 10-50 More than 50 Attached specifications to the tender documentation as required Please select Never done Less than 10 Around 10-50 More than 50 Attached other supporting documents to the tender documentation as required Please select Never done Less than 10 Around 10-50 More than 50 Conducted preliminary evaluation of completed tender documentation Please select Never done Less than 10 Around 10-50 More than 50 Checked tender documents to ensure conformity with company guidelines Please select Never done Less than 10 Around 10-50 More than 50 Checked calculations to ensure conformity with company guidelines Please select Never done Less than 10 Around 10-50 More than 50 Provided tender documentation to appropriate staff member for approval Please select Never done Less than 10 Around 10-50 More than 50 Prepared final documents for submission to the client Please select Never done Less than 10 Around 10-50 More than 50 Prepared final amendments for submission to the client Please select Never done Less than 10 Around 10-50 More than 50 "" ""
CPCCBC5001B Apply building codes and standards to the construction process for medium rise building projects Have you performed the following: "" Task Response Liased with engineers and certifiers on a medium rise construction Please select Never done Less than 10 Around 10-50 More than 50 "" Used Volume 1 and 2 of the BCA for a medium rise construction Please select Never done Less than 10 Around 10-50 More than 50 "" Obtained Forms 15, 16 and 21 for a project (Certificates) for a medium rise construction Please select Never done Less than 10 Around 10-50 More than 50 "" Applied clauses from the BCA to a project for a medium rise construction Please select Never done Less than 10 Around 10-50 More than 50 "" Determined requirements from the BCA for a medium rise construction Please select Never done Less than 10 Around 10-50 More than 50 "" Determined and used requirements from referenced Australian Standards for a project Please select Never done Less than 10 Around 10-50 More than 50 "" Determined the nature of a building according to its use for a medium rise construction Please select Never done Less than 10 Around 10-50 More than 50 "" Determined the Class of a building using the criteria in the BCA for a medium rise construction Please select Never done Less than 10 Around 10-50 More than 50 "" Ensured a project meets BCA's requirements for a medium rise construction Please select Never done Less than 10 Around 10-50 More than 50 "" Researched and used a 'Performance Solution' to meet Performance Requirements in BCA Please select Never done Less than 10 Around 10-50 More than 50 "" Researched and used a 'Deemed-to-Satisy' / 'Acceptable Construction Practice' solution Please select Never done Less than 10 Around 10-50 More than 50 "" Determined the FRL's for a variety of medium rise buildings Please select Never done Less than 10 Around 10-50 More than 50 "" Identified and applied passive and active fire protection to medium rise buildings Please select Never done Less than 10 Around 10-50 More than 50 "" Conducted an audit of an existing building for passive and active fire protection requirements Please select Never done Less than 10 Around 10-50 More than 50 Established and implemented processes to coordinate the work of professional consultants Please select Never done Less than 10 Around 10-50 More than 50 Built or supervised a medium rise building Please select Never done Less than 10 Around 10-50 More than 50 "" ""
CPCCBC5002A Monitor costing systems on medium rise building and construction projects Have you performed the following: "" Task Response Supervised staff members in their identification of building or construction costs Please select Never done Less than 10 Around 10-50 More than 50 Translated definitive cost estimates into the correct cost centres that have been identified Please select Never done Less than 10 Around 10-50 More than 50 "" Compared estimated cost with estimated risk after undertaking a risk assessment Please select Never done Less than 10 Around 10-50 More than 50 "" Prepared draft and actual schedules of project expenditure with critical points identified Please select Never done Less than 10 Around 10-50 More than 50 "" Identified critical financial phases of a project and cash flows matched to expenditure Please select Never done Less than 10 Around 10-50 More than 50 "" Prepared interim payment claims and rise and fall calculations Please select Never done Less than 10 Around 10-50 More than 50 Prepared projected S curves to show cash flow and resource control Please select Never done Less than 10 Around 10-50 More than 50 Prepared and compared projected cash flow and payments using time risk and cost risk Please select Never done Less than 10 Around 10-50 More than 50 Compared cash flow using early start and late finish for pessimistic and optimistic outcomes Please select Never done Less than 10 Around 10-50 More than 50 Calculated pessimistic overdraft requirements Please select Never done Less than 10 Around 10-50 More than 50 Monitored cash flow and creditor payments daily Please select Never done Less than 10 Around 10-50 More than 50 Compared budget cost of the network to actual costs in the tender calculations Please select Never done Less than 10 Around 10-50 More than 50 Identified and analysed reasons for any cost variations Please select Never done Less than 10 Around 10-50 More than 50 Taken and recorded remedial action to retain contract financial compliance Please select Never done Less than 10 Around 10-50 More than 50 Compared actual costs with estimates at the completion of the job and compiled a report Please select Never done Less than 10 Around 10-50 More than 50 Adjusted organisational rates based on the final cost report and current movements in rates Please select Never done Less than 10 Around 10-50 More than 50 "" ""
CPCCBC5003A Supervise the planning of on-site medium rise building or construction work Have you performed the following: "" Task Response Reviewed contract documentation to identify and unusual aspects of construction, penalties, etc Please select Never done Less than 10 Around 10-50 More than 50 Determined availability of subcontractors and materials to suit the project Please select Never done Less than 10 Around 10-50 More than 50 "" Established site access requirements and limitations and action taken to facilitate entry to site Please select Never done Less than 10 Around 10-50 More than 50 "" Obtained building approvals and etablished contact with statutory authorities Please select Never done Less than 10 Around 10-50 More than 50 "" Implemented and maintained procedures for controlling and recording site deliveries Please select Never done Less than 10 Around 10-50 More than 50 "" Identified organisational strategies for implementing construction operations Please select Never done Less than 10 Around 10-50 More than 50 "" Implemented procedures for recording the hire of plant and equipment Please select Never done Less than 10 Around 10-50 More than 50 "" Established OHS and rehabilitation policy and procedures Please select Never done Less than 10 Around 10-50 More than 50 "" Implemented procedures for removal of existing services and hazardous materials Please select Never done Less than 10 Around 10-50 More than 50 "" Establiahed procedures for controlling multiple sites and sequenced construction operations Please select Never done Less than 10 Around 10-50 More than 50 "" Prepared a project schedule including a critical path Please select Never done Less than 10 Around 10-50 More than 50 "" Determined and documented temporary services requirements Please select Never done Less than 10 Around 10-50 More than 50 "" Determined plant requirements and availability dates Please select Never done Less than 10 Around 10-50 More than 50 "" Determined and documented on-site labour requirements Please select Never done Less than 10 Around 10-50 More than 50 Completed reports on the condition of existing buildings on adjacent sites Please select Never done Less than 10 Around 10-50 More than 50 Forwarded copies of condition reports to owners of adjacent buildings prior to starting project Please select Never done Less than 10 Around 10-50 More than 50 "" ""
CPCCBC5010B Manage construction work Have you performed the following: "" Task Response Please select Never done Less than 10 Around 10-50 More than 50 Please select Never done Less than 10 Around 10-50 More than 50 "" Please select Never done Less than 10 Around 10-50 More than 50 "" Please select Never done Less than 10 Around 10-50 More than 50 "" Please select Never done Less than 10 Around 10-50 More than 50 "" Please select Never done Less than 10 Around 10-50 More than 50 "" Please select Never done Less than 10 Around 10-50 More than 50 "" Please select Never done Less than 10 Around 10-50 More than 50 "" Please select Never done Less than 10 Around 10-50 More than 50 "" Please select Never done Less than 10 Around 10-50 More than 50 "" Please select Never done Less than 10 Around 10-50 More than 50 Please select Never done Less than 10 Around 10-50 More than 50 Please select Never done Less than 10 Around 10-50 More than 50 Please select Never done Less than 10 Around 10-50 More than 50 Please select Never done Less than 10 Around 10-50 More than 50 Please select Never done Less than 10 Around 10-50 More than 50 "" ""
CPCCBC5018B Apply structural principles to the construction of medium rise buildings Have you performed the following: "" Task Response Applied structural principles when planning the erection of a structure Please select Never done Less than 10 Around 10-50 More than 50 Applied structural principles when planning the demolition of a structure Please select Never done Less than 10 Around 10-50 More than 50 "" Analysed and planned for the structural integrity of a medium rise building Please select Never done Less than 10 Around 10-50 More than 50 "" Analysed and planned for the structural integrity of a medium rise building Please select Never done Less than 10 Around 10-50 More than 50 "" Planned and coordinated the laying of footings to a medium rise building Please select Never done Less than 10 Around 10-50 More than 50 "" Managed the laying of footings to a medium rise building Please select Never done Less than 10 Around 10-50 More than 50 "" Planned and coordinated the laying of a floor system to a medium rise building Please select Never done Less than 10 Around 10-50 More than 50 "" Managed the laying of a floor system to a medium rise building Please select Never done Less than 10 Around 10-50 More than 50 "" Planned and coordinated the building of the wall system to a medium rise building Please select Never done Less than 10 Around 10-50 More than 50 "" Managed the building of the wall system to a medium rise building Please select Never done Less than 10 Around 10-50 More than 50 "" Planned and coordinated the building of the roof system to a medium rise building Please select Never done Less than 10 Around 10-50 More than 50 Managed the building of the roof system to a medium rise building Please select Never done Less than 10 Around 10-50 More than 50 Planned and coordinated the fixing of the wall cladding system to a medium rise building Please select Never done Less than 10 Around 10-50 More than 50 Managed the fixing of the wall cladding system to a medium rise building Please select Never done Less than 10 Around 10-50 More than 50 Supervised the installation of windows and external doors to a medium rise building Please select Never done Less than 10 Around 10-50 More than 50 Have you built or supervised the construction of a medium rise building? Please select Yes No "" ""
CPCCBC4005A Produce labour and material schedules for ordering Have you performed the following: "" Task Response Included all contractual requirements in schedules Please select Never done Less than 10 Around 10-50 More than 50 Included local government conditions of approval in schedules Please select Never done Less than 10 Around 10-50 More than 50 "" Included regulatory bodies conditions of approval in schedules Please select Never done Less than 10 Around 10-50 More than 50 "" Included colour selections in schedules Please select Never done Less than 10 Around 10-50 More than 50 "" Included variations to contracts in schedules Please select Never done Less than 10 Around 10-50 More than 50 "" Detailed nominated suppliers and contractors in work schedules Please select Never done Less than 10 Around 10-50 More than 50 "" Produced relevant overlay drawings Please select Never done Less than 10 Around 10-50 More than 50 "" Included contract details and instructions in orders Please select Never done Less than 10 Around 10-50 More than 50 Applied contract rates to material and labour schedules Please select Never done Less than 10 Around 10-50 More than 50 Included all necessary site documents in a site file Please select Never done Less than 10 Around 10-50 More than 50 Prepared call forward sheets detailing all orders Please select Never done Less than 10 Around 10-50 More than 50 Analysed project costs against estimates during construction Please select Never done Less than 10 Around 10-50 More than 50 Analaysed approved variation costs Please select Never done Less than 10 Around 10-50 More than 50 Provided final project cost analysis Please select Never done Less than 10 Around 10-50 More than 50 Incorporated approved variation cost increases into site files Please select Never done Less than 10 Around 10-50 More than 50 Included in site files changes to standard plans, specifications and cost files Please select Never done Less than 10 Around 10-50 More than 50 "" ""
CPCCBC4006B Select, procure and store construction materials for low rise projects Have you performed the following: "" Task Response Identified the suitability of materials commonly used for low rise buildings for a building system Please select Never done Less than 10 Around 10-50 More than 50 Identified properties of materials, their quality and compatability with different materials Please select Never done Less than 10 Around 10-50 More than 50 "" Identified environmental impacts of different materials Please select Never done Less than 10 Around 10-50 More than 50 "" Identified impact of allowable tolerances on naturally occuring materials Please select Never done Less than 10 Around 10-50 More than 50 "" Checked tolerances when installing and assembling materials against standards Please select Never done Less than 10 Around 10-50 More than 50 "" Selected materials that are structurally adequate and appropriate for a building system Please select Never done Less than 10 Around 10-50 More than 50 "" Selected materials for their safety, required FRL, durability, serviceability and cost effectiveness Please select Never done Less than 10 Around 10-50 More than 50 "" Considered short and long term degradation of materials Please select Never done Less than 10 Around 10-50 More than 50 "" Evaluated and selected alternative materials Please select Never done Less than 10 Around 10-50 More than 50 "" Finalised the selection of materials in consultation with professionals and the client Please select Never done Less than 10 Around 10-50 More than 50 "" Determined the limitations and effects of transportation on materials and components Please select Never done Less than 10 Around 10-50 More than 50 "" Handled materials correctly and safely on site Please select Never done Less than 10 Around 10-50 More than 50 "" Stored materials in accordance with manufacturer's recommendations Please select Never done Less than 10 Around 10-50 More than 50 "" Inspected materials delivered on site for defects before being used Please select Never done Less than 10 Around 10-50 More than 50 "" Made personnel aware of action to be taken in case of defects caused by incorrect installation Please select Never done Less than 10 Around 10-50 More than 50 Preserved timber and protected metals used Please select Never done Less than 10 Around 10-50 More than 50 "" ""
CPCCBC4009B Apply legal requirements to building and construction projects Have you performed the following: "" Task Response Identified and met legislative requirements for WHS, building work, environmental and insurance Please select Never done Less than 10 Around 10-50 More than 50 Identied and provided site safety signage Please select Never done Less than 10 Around 10-50 More than 50 "" Obtained appropriate insurance cover Please select Never done Less than 10 Around 10-50 More than 50 "" Selected and entered into contracts, including head and subcontracts Please select Never done Less than 10 Around 10-50 More than 50 "" Administered a payroll system Please select Never done Less than 10 Around 10-50 More than 50 "" Administered a provision for remitting GST to the ATO Please select Never done Less than 10 Around 10-50 More than 50 "" Researched and applied relevant industrial relations obligations Please select Never done Less than 10 Around 10-50 More than 50 "" Applied relevant awards to personnel employed Please select Never done Less than 10 Around 10-50 More than 50 "" Used workplace agreements Please select Never done Less than 10 Around 10-50 More than 50 "" Taken measures to ensure discrimination and harassment are not practiced in the workplace Please select Never done Less than 10 Around 10-50 More than 50 "" Identified and applied provisions of training agreements Please select Never done Less than 10 Around 10-50 More than 50 Made available to employees reference material on industrial relations or legal information Please select Never done Less than 10 Around 10-50 More than 50 Applied organisational dispute resolution processes Please select Never done Less than 10 Around 10-50 More than 50 Dealt with customer complaints Please select Never done Less than 10 Around 10-50 More than 50 Documented, recorded and maintained disputes Please select Never done Less than 10 Around 10-50 More than 50 Do you currently hold a building licence, or have you held one in the past? Please select Yes No "" ""
CPCCBC5018B Apply structural principles to the construction of medium rise buildings Have you performed the following: "" Task Response Applied structural principles when planning the erection of a structure Please select Never done Less than 10 Around 10-50 More than 50 Applied structural principles when planning the demolition of a structure Please select Never done Less than 10 Around 10-50 More than 50 "" Analysed and planned for the structural integrity of a low rise commercial building Please select Never done Less than 10 Around 10-50 More than 50 "" Analysed and planned for the structural integrity of a low rise commercial building Please select Never done Less than 10 Around 10-50 More than 50 "" Planned and coordinated the laying of footings to a low rise commercial building Please select Never done Less than 10 Around 10-50 More than 50 "" Managed the laying of footings to a low rise commercial building Please select Never done Less than 10 Around 10-50 More than 50 "" Planned and coordinated the laying of a floor system to a low rise commercial building Please select Never done Less than 10 Around 10-50 More than 50 "" Managed the laying of a floor system to a low rise commercial building Please select Never done Less than 10 Around 10-50 More than 50 "" Planned and coordinated the building of the wall system to a low rise commercial building Please select Never done Less than 10 Around 10-50 More than 50 "" Managed the building of the wall system to a low rise commercial building Please select Never done Less than 10 Around 10-50 More than 50 Planned and coordinated the building of the roof system to a low rise commercial building Please select Never done Less than 10 Around 10-50 More than 50 Managed the building of the roof system to a low rise commercial building Please select Never done Less than 10 Around 10-50 More than 50 Planned and coordinated the fixing of the wall cladding system to a low rise commercial building Please select Never done Less than 10 Around 10-50 More than 50 Managed the fixing of the wall cladding system to a low rise commercial building Please select Never done Less than 10 Around 10-50 More than 50 Supervised the installation of windows and external doors to a low rise commercial building Please select Never done Less than 10 Around 10-50 More than 50 Have you built or supervised the construction of a low rise commercial building? Please select Yes No "" ""
CPCCBC4012B Read and interpret plans and specifications Have you performed the following: "" Task Response Identified the purpose and advantages of different types of drawings Please select Never done Less than 10 Around 10-50 More than 50 Identified different aspects of drawings Please select Never done Less than 10 Around 10-50 More than 50 "" Identified, understood and applied commonly used symbols on drawings Please select Never done Less than 10 Around 10-50 More than 50 "" Identified, understood and applied commonly used abbreviations on drawings Please select Never done Less than 10 Around 10-50 More than 50 "" Identified, understood and applied common building terms used on drawings Please select Never done Less than 10 Around 10-50 More than 50 Identified building site from drawings Please select Never done Less than 10 Around 10-50 More than 50 Identified true north and building orientation from details provided on site plan Please select Never done Less than 10 Around 10-50 More than 50 Identified key features of a site plan Please select Never done Less than 10 Around 10-50 More than 50 Identified key features of plans and sections Please select Never done Less than 10 Around 10-50 More than 50 Identified key features of sections Please select Never done Less than 10 Around 10-50 More than 50 Identified client requested variations on drawings Please select Never done Less than 10 Around 10-50 More than 50 Identified and correctly applied Provisional Sum and Prime Cost Item values Please select Never done Less than 10 Around 10-50 More than 50 Identified customer variations to standard specifications Please select Never done Less than 10 Around 10-50 More than 50 Correctly interpreted essential elements to estimation, planning and supervisory tasks Please select Never done Less than 10 Around 10-50 More than 50 Identified building codes or standards affecting the work to be undertaken Please select Never done Less than 10 Around 10-50 More than 50 Identified key features of products included in the specification including design, purpose, etc Please select Never done Less than 10 Around 10-50 More than 50 "" ""
CPCCBC4014A Prepare simple building sketches drawings Have you performed the following: "" Task Response Identified types of drawings and key features to be recorded with type of job undertaken Please select Never done Less than 10 Around 10-50 More than 50 Identified and followed OHS requirements on site Please select Never done Less than 10 Around 10-50 More than 50 Used tools and equipment required for inspection and measurement and producing drawings Please select Never done Less than 10 Around 10-50 More than 50 Carried out inspection of relevant area and taken measurements accordingly Please select Never done Less than 10 Around 10-50 More than 50 Created simple 2D and 3D sketches and drawings Please select Never done Less than 10 Around 10-50 More than 50 Created sectional drawings using conventional drawing techniques Please select Never done Less than 10 Around 10-50 More than 50 Recorded essential information through sysmbols and abbreviations on drawings Please select Never done Less than 10 Around 10-50 More than 50 Labelled, dated and processed drawings Please select Never done Less than 10 Around 10-50 More than 50 "" ""
CPCCBC5004A Supervise and apply quality standards to the selection of building and construction materials Have you performed the following: "" Task Response Identified the suitability of materials commonly used for low rise buildings for a building system Please select Never done Less than 10 Around 10-50 More than 50 Identified properties of materials, their quality and compatability with different materials Please select Never done Less than 10 Around 10-50 More than 50 "" Identified environmental impacts of different materials Please select Never done Less than 10 Around 10-50 More than 50 "" Identified impact of allowable tolerances on naturally occuring materials Please select Never done Less than 10 Around 10-50 More than 50 "" Checked tolerances when installing and assembling materials against standards Please select Never done Less than 10 Around 10-50 More than 50 "" Selected materials that are structurally adequate and appropriate for a building system Please select Never done Less than 10 Around 10-50 More than 50 "" Selected materials for their safety, required FRL, durability, serviceability and cost effectiveness Please select Never done Less than 10 Around 10-50 More than 50 "" Considered short and long term degradation of materials Please select Never done Less than 10 Around 10-50 More than 50 "" Evaluated and selected alternative materials Please select Never done Less than 10 Around 10-50 More than 50 "" Finalised the selection of materials in consultation with professionals and the client Please select Never done Less than 10 Around 10-50 More than 50 "" Determined the limitations and effects of transportation on materials and components Please select Never done Less than 10 Around 10-50 More than 50 "" Handled materials correctly and safely on site Please select Never done Less than 10 Around 10-50 More than 50 "" Stored materials in accordance with manufacturer's recommendations Please select Never done Less than 10 Around 10-50 More than 50 "" Inspected materials delivered on site for defects before being used Please select Never done Less than 10 Around 10-50 More than 50 "" Made personnel aware of action to be taken in case of defects caused by incorrect installation Please select Never done Less than 10 Around 10-50 More than 50 Preserved timber and protected metals used Please select Never done Less than 10 Around 10-50 More than 50 "" ""
CPCCBC5007B Administer the legal obligations of a building or construction contractor Have you performed the following: "" Task Response Identified and met legislative requirements for WHS, building work, environmental and insurance Please select Never done Less than 10 Around 10-50 More than 50 Identied and provided site safety signage Please select Never done Less than 10 Around 10-50 More than 50 "" Obtained appropriate insurance cover Please select Never done Less than 10 Around 10-50 More than 50 "" Selected and entered into contracts, including head and subcontracts Please select Never done Less than 10 Around 10-50 More than 50 "" Administered a payroll system Please select Never done Less than 10 Around 10-50 More than 50 "" Administered a provision for remitting GST to the ATO Please select Never done Less than 10 Around 10-50 More than 50 "" Researched and applied relevant industrial relations obligations Please select Never done Less than 10 Around 10-50 More than 50 "" Applied relevant awards to personnel employed Please select Never done Less than 10 Around 10-50 More than 50 "" Used workplace agreements Please select Never done Less than 10 Around 10-50 More than 50 "" Taken measures to ensure discrimination and harassment are not practiced in the workplace Please select Never done Less than 10 Around 10-50 More than 50 "" Identified and applied provisions of training agreements Please select Never done Less than 10 Around 10-50 More than 50 Made available to employees reference material on industrial relations or legal information Please select Never done Less than 10 Around 10-50 More than 50 Applied organisational dispute resolution processes Please select Never done Less than 10 Around 10-50 More than 50 Dealt with customer complaints Please select Never done Less than 10 Around 10-50 More than 50 Documented, recorded and maintained disputes Please select Never done Less than 10 Around 10-50 More than 50 Do you currently hold a building licence, or have you held one in the past? Please select Yes No "" ""
CPCCBC4018 A Apply site surveys and set-out procedures to building and construction projects Have you performed the following: "" Task Response Calculated trigonometric calculations commonly used with grid lines, off sets and right angles Please select Never done Less than 10 Around 10-50 More than 50 Calculated geometric calculations commonly used with grid lines, off sets and right angles Please select Never done Less than 10 Around 10-50 More than 50 "" Carried out site set-out procedures for a building Please select Never done Less than 10 Around 10-50 More than 50 "" Identified errors in measured distances due to site characteristics Please select Never done Less than 10 Around 10-50 More than 50 "" Conducted cut and fill calculations without error Please select Never done Less than 10 Around 10-50 More than 50 "" Used a levelling device Please select Never done Less than 10 Around 10-50 More than 50 "" Demonstrated error present in a level by conducting a 'two peg test' Please select Never done Less than 10 Around 10-50 More than 50 "" Peformed a closed level run (closed traverse) by the rise and fall and HPC of collimation method Please select Never done Less than 10 Around 10-50 More than 50 Calculated staff readings to enable a specific reduced level (RL) Please select Never done Less than 10 Around 10-50 More than 50 Determined set out grid and levels Please select Never done Less than 10 Around 10-50 More than 50 Prepared contour plans to specific tolerances and stated contour intervals Please select Never done Less than 10 Around 10-50 More than 50 Determined volume of solids and the surface being levelled and contoured Please select Never done Less than 10 Around 10-50 More than 50 Drawn longitudinal sections from reduced levels and running chainages Please select Never done Less than 10 Around 10-50 More than 50 Determined levels and clearances from given grades and distances to specific tolerances Please select Never done Less than 10 Around 10-50 More than 50 Determined calculations and expressions of grades in three forms to specific tolerances Please select Never done Less than 10 Around 10-50 More than 50 Determined calculations for batter levels from grades and distances without error Please select Never done Less than 10 Around 10-50 More than 50 "" ""
CPCCBC4024A Resolve business disputes Have you performed the following: "" Task Response Reviewed and implemented established business dispute resolution procedures Please select Never done Less than 10 Around 10-50 More than 50 Developed business dispute resolution procedures where required Please select Never done Less than 10 Around 10-50 More than 50 "" Secured agreement to dispute resolution procedures from all parties Please select Never done Less than 10 Around 10-50 More than 50 "" Established recording procedures Please select Never done Less than 10 Around 10-50 More than 50 "" Made provision for record keeping Please select Never done Less than 10 Around 10-50 More than 50 Identified external arbitrators to use for when disputes can't be resolved Please select Never done Less than 10 Around 10-50 More than 50 Identified external conciliators to use for when disputes can't be resolved Please select Never done Less than 10 Around 10-50 More than 50 Identifed and documented nature of business disputes Please select Never done Less than 10 Around 10-50 More than 50 Identifed and documented cause of business disputes Please select Never done Less than 10 Around 10-50 More than 50 Identified and approached parties to a dispute to clarify issues Please select Never done Less than 10 Around 10-50 More than 50 Suggested solutions based on an examination of information collected Please select Never done Less than 10 Around 10-50 More than 50 Made efforts to bring disputing parties together Please select Never done Less than 10 Around 10-50 More than 50 Consulted external arbiters where necessary Please select Never done Less than 10 Around 10-50 More than 50 Consulted external conciliators where necessary Please select Never done Less than 10 Around 10-50 More than 50 Identified, applied and followed relevant statutory laws Please select Never done Less than 10 Around 10-50 More than 50 Resolved disputes in accordance with common law Please select Never done Less than 10 Around 10-50 More than 50 "" ""
Previous study and completed courses Have you completed any of the following courses: Course Response CNJ45 Associate Diploma of Applied Science (Building) Please select Yes No CNBUI013 Diploma of Building Please select Yes No BCG40208 Diploma of Building and Construction (Building) Please select Yes No CPC50208 Diploma of Building and Construction (Building) Please select Yes No "" ""
Summary Here is a summary of the possibility of RPL based on your responses: Unit Likelihood No = You will not be able to gain an RPL, you will need to enrol in the unit and complete it normally. Unlikely = it is extremely unlikely you would be successful in an RPL application based on your responses. We highly recommend to complete under normal enrolment, however the choice is yours. Likely = it is quite possible that you could apply for, and be granted, RPL for the unit. However this is based on you providing suitable and satisfactory evidence in addition to completing a quizz, experience video, work history, etc. Possibly = depends on what units you completed for the relevant course/s. We will need to check your academic transcript to confirm you have completed the required unit/s. Please complete the details below and click the 'submit' button. If it looks like you can apply for RPL for a unit/s, we will be in touch soon to advise on the next step. If it is unlikely that you would be successful in an RPL, we will contact you to advise how normal enrolment works and if you would like more information, etc. Please complete your details below and then click the 'submit' button. Name Email Mobile Please enter some background information about yourself, eg experience, knowledge, goals, etc