CPCCBC6017A
Evaluate services layout and connection methods for the planning of large
building projects
|
|
|
Have
you performed the following:
|
|
|
Task
|
Response
|
|
Evaluated
layouts of water supply for general use, including seeking advice from
professionals
|
|
|
|
Evaluated
layouts of water supply for fire fighting, including seeking advice from
professionals
|
|
|
|
Evaluated
sewerage disposal methods and layouts, including seeking advice from
professionals
|
|
|
|
Evaluated
drainage methods and their layouts, including seeking advice from
professionals
|
|
|
|
Managed the
connection of drainage of a new building to council mains
|
|
|
|
Evaluated a
smoke hazard management system, including methods and layouts
|
|
|
|
Evaluated an
air conditioning system including methods and layouts
|
|
|
|
Sought
professional experise in evaluating a smoke hazard and air conditioning
system
|
|
|
|
Evaluated hot
water systems for a low rise, medium rise and multi-storey building
|
|
|
|
Identified
natural lighting requirements to a Type C, Type B and Type A building
|
|
|
|
Evaluated
suitable lighting fixtures for a range of operations
|
|
|
|
Evaluated
fire-fighting services, including seeking advice from professionals
|
|
|
|
Evaluated
fire detection services including seeking advice from professionals
|
|
|
|
Determined
requirements for general electrical installation
|
|
|
|
Determined
electronic service installation, including emergency warning systems
|
|
|
|
Built or
supervised installation of services to a Type A, Type B and Type C building
|
|
|
|
|
|
|
|
|
|
|
|
|
|