Name of Work :- LEAD STATEMENT Sr No Material Lead (km) Unit Lead Charges Quarry Location 2 Cement MT 3 Steel MT 4 Sand CuM 5 Metal CuM 6 Rubble CuM 7 Hearting Material CuM 8 Casing Material CuM 1 Cerified that the leads shown in above stetement are verified by me and found correct 2 No material is available at lesserleads than shown above 3 Sufficient Quantity and good quality material is available at the quarry shown above. Name of Work :- RATE ANALYSIS "" Discriptions In Soil In HM In SR Basic Rate (Rs/CuM) Trible Area Charges Sub Total Labour Welfare Charges Praposed Rate ( Rs/CuM ) "" Basic Rate (Rs/BHP Hour) Trible Area Charges Labour Charges Sub Total Labour Welfare Charges Praposed Rate for Dewatering ( Rs/BHP Hour) "" Basic Rate (Rs/CuM) Cement cost difference Sub Total Component Constant Lead (km) Lead charges Cement Sand Metal Net Total Material Cost excluding Royalty and Cement Charges Trible Area Charges [ (Calculated Rate ) - ( Material Cost ) ] x 10% Royalty Charges Labour Welfare Praposed Rate for Concrete work M15 : 40MSA (Rs/CuM) "" R/F Work Anchor Type of Bars 10 mm 12 mm 25 mm Basic Rate (Rs/MT) TMT-without GST Add for binding wire charges ( 1kg / 1 quntal) Required 10kg/MT Basic Rate of Binding wire (Rs/kg) : Add for Lead Charges Labour Charges Trible Area Charges Labour Welfare charges Praposed Rate for TMT Reainforcement ( Rs/MT) Average R/F Work Anchor Type of Bars 10 mm 12 mm 25 mm Basic Rate (Rs/MT) Round-without GST Add for binding wire charges ( 1kg / 1 quntal) Required 10kg/MT Basic Rate of Binding wire (Rs/kg) : Add for Lead Charges Labour Charges Trible Area Charges Labour Welfare charges Average Rate for TMT Reainforcement ( Rs/MT) Average Average Rate for Total Reinforcement = ( TMT Rate + Round Rate ) / 2 = Praposed Rate for Reianforcement ( Rs/MT) Praposed Rate for Anchor Bars (Rs/Kg) "" Basic Rate (Rs/SqM) Trible Area Charges Labour Welfare Charges Praposed Rate for formwork (Rs/SqM) "" MS Neddle Basic Rate (Rs/MT) Derived Rate (Rs/No) ( W-94 kg : 2.10 m x 0.50 m ) Add for Lead Charges Trible Area Charges Total Labour Welfare Charges Net Rate ( Rs/MT) Proposed Rate for MS Neddle ( Rs/No) MS Beam and Chaneels Using L section : 75 x 40 x 6 mm Weight of L Sections 6.80 kg/m x 2 = 13.60 kg Weight of flat ms connector 30x3 0.70 kg Total weght / m 13.60 +0.70 = 14.30 kg Basic Rate ( Rs/MT ) Basic Rate (Rs/Kg) Calulate Rate for L section of 13.60 kg Add Lead Charges Trible Charges Total Labour Welfare MS Beam and Chaneels (Rs/M) Emabackment Emabackment ( Available ) Embackment ( Casing ) Basic Rate Hearting Hearting Basic Rate Casing Casing Average Rate Trible Area Charges Trible Area Charges Net Labour Welfare Labour Welfare Rate for Embackment Av ( Rs/CuM) Rate for Embackment Br (Rs/CuM) 3