Name of Work :-
LEAD STATEMENT
Sr No Material Lead (km) Unit Lead Charges Quarry Location
2 Cement
MT
3 Steel
MT
4 Sand
CuM
5 Metal
CuM
6 Rubble
CuM
7 Hearting Material CuM
8 Casing Material CuM
1 Cerified that the leads shown in above stetement are verified by me and found correct
2 No material is available at lesserleads than shown above
3 Sufficient Quantity and good quality material is available at the quarry shown above.
Name of Work :-
RATE ANALYSIS
Discriptions In Soil In HM In SR
Basic Rate (Rs/CuM)
Trible Area Charges
Sub Total
Labour Welfare Charges
Praposed Rate ( Rs/CuM )
Basic Rate (Rs/BHP Hour)
Trible Area Charges
Labour Charges
Sub Total
Labour Welfare Charges
Praposed Rate for Dewatering ( Rs/BHP Hour)
Basic Rate (Rs/CuM)
Cement cost difference
Sub Total
Component Constant Lead (km) Lead charges
Cement
Sand
Metal
Net Total
Material Cost excluding Royalty and Cement Charges
Trible Area Charges
 [ (Calculated Rate ) - ( Material Cost ) ] x 10%
Royalty Charges
Labour Welfare 
Praposed Rate for Concrete work M15 : 40MSA (Rs/CuM)
R/F Work Anchor
Type of Bars 10 mm 12 mm 25 mm
Basic Rate (Rs/MT) TMT-without GST
Add for binding wire charges ( 1kg / 1 quntal) Required 10kg/MT
Basic Rate of Binding wire (Rs/kg) :
Add for Lead Charges
Labour Charges
Trible Area Charges
Labour Welfare charges
Praposed Rate for TMT Reainforcement ( Rs/MT) Average
R/F Work Anchor
Type of Bars 10 mm 12 mm 25 mm
Basic Rate (Rs/MT) Round-without GST
Add for binding wire charges ( 1kg / 1 quntal) Required 10kg/MT
Basic Rate of Binding wire (Rs/kg) :
Add for Lead Charges
Labour Charges
Trible Area Charges
Labour Welfare charges
Average Rate for TMT Reainforcement ( Rs/MT) Average
Average Rate for Total Reinforcement = ( TMT Rate + Round Rate ) / 2 =
Praposed Rate for Reianforcement ( Rs/MT)
Praposed Rate for Anchor Bars (Rs/Kg)
Basic Rate (Rs/SqM)
Trible Area Charges
Labour Welfare Charges
Praposed Rate for formwork (Rs/SqM)
MS Neddle
Basic Rate (Rs/MT)
Derived Rate (Rs/No) ( W-94 kg : 2.10 m x 0.50 m )
Add for Lead Charges
Trible Area Charges
Total
Labour Welfare Charges
Net Rate ( Rs/MT)
Proposed Rate for MS Neddle ( Rs/No)
MS Beam and Chaneels
Using L section : 75 x 40 x 6 mm
Weight of L Sections 6.80 kg/m x 2 = 13.60 kg
Weight of flat ms connector 30x3 0.70 kg
Total weght / m 13.60 +0.70 = 14.30 kg
Basic Rate ( Rs/MT )
Basic Rate (Rs/Kg)
Calulate Rate for L section of 13.60 kg
Add Lead Charges
Trible Charges 
Total
Labour Welfare 
MS Beam and Chaneels (Rs/M)
Emabackment 
Emabackment ( Available ) Embackment ( Casing )
Basic Rate Hearting
Hearting
Basic Rate Casing
Casing
Average Rate
Trible Area Charges
Trible Area Charges
Net
Labour Welfare 
Labour Welfare
Rate for Embackment Av ( Rs/CuM)
Rate for Embackment Br (Rs/CuM)
3
Finish

1/1

Ready to reset
Are you sure to reset the Form's values?
Submit cannot initiate
Cannot submit right now, please browse to last page!!
Ready to submit
This form is complete and has passed all validation tests. Do you want to submit now?